The DumpsFree is a reliable and trusted platform that is committed to making the Dell PowerEdge XE9680 and XE8640 Install (D-PEXE-IN-A-00) exam preparation instant, simple and successful. To do this the DumpsFree is offering top-rated and real Dell PowerEdge XE9680 and XE8640 Install (D-PEXE-IN-A-00) exam questions with high-in-demand features. These features are inclusively designed to ace the EMC D-PEXE-IN-A-00 exam preparation.
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
>> D-PEXE-IN-A-00 Exam Preparation <<
Our D-PEXE-IN-A-00 guide torrent is compiled by experts and approved by the experienced professionals. The language is easy to be understood to make any learners have no learning obstacles and our D-PEXE-IN-A-00 study questions are suitable for any learners. The software boosts varied self-learning and self-assessment functions to check the results of the learning. The software can help the learners find the weak links and deal with them. Our D-PEXE-IN-A-00 Exam Torrent boosts timing function and the function to stimulate the exam. It is very easy to pass the D-PEXE-IN-A-00 exam with our D-PEXE-IN-A-00 learning guide.
NEW QUESTION # 13
A deployment engineer is installing a PowerEdge XE8640 server in a rack with round holes. They cannot get the outer rail portion to fit flush with the rack frame.
What is the reason the outer rail is not flush with the frame?
Answer: C
Explanation:
* Understanding Rail Types and Compatibility:
* Dell PowerEdge servers, including the XE8640, come with rail kits designed for specific types of racks. The rail kits are tailored to fit racks with square holes or threaded holes, depending on the model and configuration.
* Compatibility with Round-Hole Racks:
* The PowerEdge XE8640 does not support installation in round-hole racks. The rail kits provided with the XE8640 are designed for 4-post racks with square holes or 4-post threaded racks.
Attempting to install these rails in a round-hole rack will result in improper fitment and stability issues.
* Common Installation Issues:
* If the outer rail portion does not fit flush with the rack frame, it is often due to a compatibility issue with the rack type. Round-hole racks require specific rail kits that are different from those used for square or threaded hole racks.
* Verifying Rack Type:
* Before installation, verify the type of rack being used. Ensure that it matches the specifications outlined in the server's installation guide. Using the correct rack type ensures proper fitment and structural integrity.
* Alternative Solutions:
* If the current rack is a round-hole type, consider using a compatible rack with square or threaded holes for the XE8640. Alternatively, there might be adapters or conversion kits available that allow the use of standard rails in round-hole racks, although these are not typically recommended due to potential stability issues.
* References and Documentation:
* Refer to the Dell EMC PowerEdge XE8640 Installation and Service Manual for detailed information on rail and rack compatibility. This manual provides specifications for supported rack types and instructions for proper installation.
References:
* Dell EMC PowerEdge XE8640 Installation and Service Manual: This document provides comprehensive guidelines on the correct installation procedures and compatible rack types for the XE8640 server.
* Dell EMC Technical Specifications Guide: Offers detailed specifications on the rack compatibility and rail options for Dell PowerEdge servers, ensuring proper installation and fitment.
NEW QUESTION # 14
A deployment engineer is installing a PowerEdge XE8640 server. The server is on a lift, and they have aligned the server inner rails with the rail assemble that are secured in the rack. The engineer can only push the server into the rack a short distance before it stops. Pushing forcefully causes the rack to slide back.
What action should the deployment engineer take?
Answer: A
Explanation:
* Understanding Rail Locks:
* The PowerEdge XE8640 server rails are equipped with a locking mechanism to secure the server during transport and installation. This prevents the server from moving unintentionally and ensures stability.
* Identifying the Issue:
* When the server stops after being pushed only a short distance into the rack, it is likely due to the rail lock engaging. This lock must be released to allow the server to slide fully into place.
* Releasing the Rail Lock:
* Locate the rail lock mechanism on the rails. This is typically a lever or button that, when pressed, releases the lock, allowing the server to slide further into the rack.
* Detailed Steps:
* Align the Server: Ensure that the server is properly aligned with the rails before proceeding.
Misalignment can cause the server to get stuck or make it difficult to release the lock.
* Press the Release Mechanism: With the server partially inserted, locate and press the release mechanism on both sides of the rails. This should disengage the locks.
* Slide the Server: Once the locks are released, carefully push the server into the rack until it is fully seated. Ensure that the server is evenly aligned to avoid binding or getting stuck.
* Avoiding Forceful Methods:
* Avoid using excessive force to push the server into the rack as it can cause damage to the server, rails, or rack. Additionally, pushing forcefully without releasing the rail lock can lead to misalignment and potential hardware issues.
* Safety and Assistance:
* Ensure the lift is stable and properly aligned with the rack to prevent movement. If needed, have an assistant stabilize the lift while performing the installation steps.
* Reference to Official Documentation:
* Refer to the Dell EMC PowerEdge XE8640 Installation and Service Manual for specific instructions and diagrams illustrating the rail lock mechanism and proper installation procedures.
References:
* Dell EMC PowerEdge XE8640 Installation and Service Manual: This manual provides detailed guidelines on the proper use of rail kits and the mechanism for releasing rail locks during server installation.
* Dell EMC Technical Specifications Guide: Offers comprehensive details on the hardware specifications and installation processes for Dell PowerEdge servers, including rail systems and locking mechanisms.
NEW QUESTION # 15
A deployment engineer is connecting the network cables on an XE9680 server. The data center administrator wants to know why the server does not have an OCP card for network connectivity.
How should the engineer respond to the administrator's query?
Answer: D
Explanation:
* Overview of OCP Cards:
* Open Compute Project (OCP) cards are network interface cards designed to provide high-speed networking capabilities. They are often used in data center environments to enhance network performance and flexibility.
* OCP Card on Dell PowerEdge XE9680:
* For the Dell PowerEdge XE9680 server, an OCP card is not a mandatory component. The server can achieve Power-On Self-Test (POST) and function normally without an OCP card.
* Optional Component:
* The OCP card is considered an optional component for the XE9680 server. This means it can be added based on specific networking needs but is not essential for the server's basic operations.
* Networking Alternatives:
* The XE9680 server is equipped with various other network interface options. For instance, it has integrated network ports (LAN on Motherboard, or LOM) which provide necessary network connectivity out-of-the-box.
* Customization and Upgrades:
* The optional nature of the OCP card allows data center administrators to customize their servers based on their network performance requirements. If high-speed or specific networking features are needed, the OCP card can be added accordingly.
* Communicating with the Administrator:
* The deployment engineer should explain to the data center administrator that while the OCP card is not included by default, it can be added as per the data center's specific networking needs. The server's design supports flexibility in network configurations.
References:
* Dell EMC PowerEdge XE9680 Installation and Service Manual: This manual provides detailed information on the components and optional upgrades available for the XE9680 server.
* Dell EMC Networking Guide: This guide outlines various networking options and configurations available for Dell PowerEdge servers, including the role and installation of OCP cards.
NEW QUESTION # 16
A deployment engineer is installing a PowerEdge XE8640 server. The rack has four PDUs. Looking at the rear of the rack, one power source provides power to the two left PDUs. A different power source provides power to the two right PDUs.
What side of the rack should XE8640 PSU 1 and PSU 2 be connected?
Answer: B
Explanation:
* Redundancy and Load Balancing:
* PowerEdge XE8640 servers are designed for high availability and reliability. One key aspect of this design is the redundancy provided by the server's Power Supply Units (PSUs). By connecting
* each PSU to a different power source, you ensure that the server remains operational even if one power source fails.
* Power Source Configuration:
* In this scenario, the rack has two distinct power sources: one supplying power to the two left PDUs and the other to the two right PDUs. To maximize redundancy, each PSU should be connected to a different power source.
* PSU Placement:
* PSU 1 in the left PDUs: Connect PSU 1 to one of the PDUs on the left side of the rack. This ensures that PSU 1 is powered by the first power source.
* PSU 2 in the right PDUs: Connect PSU 2 to one of the PDUs on the right side of the rack. This ensures that PSU 2 is powered by the second power source.
* Ensuring Redundancy:
* By placing PSU 1 on the left and PSU 2 on the right, you create a redundant power configuration.
If either power source fails, the other PSU can continue to supply power to the server, maintaining its operation.
* Steps for Connection:
* Step 1: Verify that the rack's PDUs are correctly connected to their respective power sources.
* Step 2: Identify the left and right PDUs based on their power source connections.
* Step 3: Connect PSU 1 to a PDU on the left side of the rack.
* Step 4: Connect PSU 2 to a PDU on the right side of the rack.
* Step 5: Confirm that both PSUs are securely connected and receiving power from separate sources.
* Safety and Verification:
* Ensure that all connections are secure and that the cables are managed to prevent interference with other components or airflow within the rack. Verify that each PSU is functioning correctly by checking the server's power status indicators.
References:
* Dell EMC PowerEdge XE8640 Installation and Service Manual: This manual provides detailed guidelines on PSU connections and power redundancy configurations.
* Dell EMC Technical Specifications Guide: Offers comprehensive details on the power requirements and redundancy features of the PowerEdge XE8640.
NEW QUESTION # 17
A deployment engineer is installing an XE9680 server. The network connectivity has 24 optical cables that route to switches in the data center. The administrator questions the use of a cablemanagement arm (CMA).
What are two items to consider when installing a CMA?
Answer: A,C
Explanation:
When installing a Cable Management Arm (CMA) on the Dell PowerEdge XE9680 server, there are specific considerations to ensure proper installation and operation:
* CMA Orientation:
* Installation Flexibility:The CMA for the XE9680 can be installed to open on either the left or right side of the server. This flexibility allows for better management of space within the rack and ensures that the CMA can accommodate the specific layout of your data center(Dell)(Dell).
* Cable Routing:
* Avoid Routing Optical Cables Through the CMA:Optical cables are typically more sensitive and less flexible compared to other types of cables. Routing them through the CMA can lead to bending, twisting, or other stresses that may damage the cables and affect network performance.
Therefore, it is advised not to route optical cables through the CMA(Dell)(Dell).
* Installation Process:
* Align and Install the CMA:Attach the CMA to the designated mounting points on the server rails.
Ensure that it is securely fastened and aligned properly to avoid any issues when extending or retracting the server from the rack.
* Organize Cables:Use the provided cable management features to route and secure other cables, ensuring they are not pinched or overly stressed. Avoid including optical cables in the CMA to prevent potential damage.
* Post-Installation Checks:
* Verify Movement:Ensure that the server can be smoothly extended and retracted with the CMA in place without any cables getting caught or strained.
* Secure Connections:Double-check all cable connections to ensure they are secure and functioning correctly.
These steps are crucial for maintaining the integrity and performance of the server and the connected network infrastructure. Proper cable management not only ensures safety but also enhances the reliability and maintainability of the data center setup.
References:
* Dell PowerEdge XE9680 Installation and Service Manual(Dell).
* Dell XE9680 Rack Rail with Cable Management Arm Information(Dell)(Dell).
NEW QUESTION # 18
......
We have free demo for D-PEXE-IN-A-00 study guide for you to have a try, so that you can have a deeper understanding of what you are going to buy. The free domo will show you what the complete version for D-PEXE-IN-A-00 exam dumps is like. Furthermore, with the outstanding experts to verify and examine the D-PEXE-IN-A-00 Study Guide, the correctness and quality can be guaranteed. You can pass the exam by using the D-PEXE-IN-A-00 exam dumps of us. You give us trust, we will ensure you to pass the exam.